PROJECT INFORMATION
Stover Road Bridge
over Dun's Run (Scioto Township)
Project Description:
Replacement of a structurally deficient concrete beam bridge in critical
condition. Project includes removal of existing bridge, and
erecting a new prestressed concrete box beam bridge with additional
improvements to the roadway approaches including pavement and shoulder
widening and guardrail installation.
Project Location and Limits:
Stover Road about 1/8 mile north of Larcomb Road.
Road Closure Information:
Road closed to through traffic with detour posted. Local resident
traffic maintained.
Project Schedule:
Design engineering: November 2005 to June 2006
Right-of-way acquisition: January to March 2008
Utility relocation: March to June 2008
Construction: August to November 2008
Engineering Information:
Construction documents prepared by EMH&T of Columbus, Ohio.
Construction Information:
Construction contract awarded to R & I Construction of Tiffin, Ohio for
$425,099.77.
Estimated Project Cost:
$541,000. An Ohio Public Works Commission grant will pay for
approximately $255,000 of the project.
|
 |
 |
|
Old concrete
beam
bridge |
New prestressed
concrete beam bridge |
|