PROJECT INFORMATION
Patrick Road over Culver Creek Bridge Replacement (Porter Township
TR-50-3.20)
Project Description:
Replacement of a narrow and structurally deficient steel beam bridge. Project includes removal of existing bridge, and installing a
34’ span x 6’ rise precast reinforced concrete flat topped culvert. Approach
improvements including pavement and shoulder widening, drainage
improvements, and guardrail installation complete the project.
Project Location and Limits:
Patrick Road about 1/4 mile east of Fredricks Road. Total project length is
about 500 feet.
Road Closure Information:
Road closed to through traffic with detour posted. Local resident
traffic maintained.
Project Schedule:
Design engineering: December 2005 to July 2007
Right-of-way acquisition: July 2007 to January 2008
Utility relocation: February to April 2008
Construction: July to September 2008
Engineering Information:
Construction documents prepared by Delaware County Engineer’s
Design
Department.
Construction Information:
Construction contract awarded to Double Z Construction of Columbus, Ohio
for $363,426.00.
Estimated Project Cost:
$426,000
|
 |
 |
|
Old steel beam
bridge built 1930+/- |
New bridge opened October 2008 |
|