PROJECT INFORMATION
Giehl Road Bridge over
Leatherwood Run (Brown
Township TR82-0.25)
Project Description:
Replacement of a structurally deficient steel beam bridge
over Leatherwood Run. Project includes reconstruction of roadway
approaches and replacement of the bridge with a prestressed concrete box
beam bridge.
Project Location and Limits:
Giehl Road about 1 mile west of North Old State Road. Project limits are
approximately 400 feet east and west of the bridge.
Road Closure Information:
Giehl Road closed to through traffic between Leonardsburg Road and North
Old State Road. Local traffic maintained to adjacent properties.
Project Schedule:
Design engineering: 2006-09
Right-of-way acquisition: Summer 2009
Utility relocation: September 2009
Construction: October to December 2009
Engineering Information:
Preliminary engineering performed by Barr & Prevost Engineering of
Columbus, Ohio.
Construction documents prepared by the Delaware County Engineer’s
Design
Department.
Construction Information:
Contract awarded to Double Z Construction of Columbus, Ohio for
$525,233.
Estimated Project Cost:
$570,000
 |
|
|
Old
bridge, built 1920+/-
New steel beams added
1980 |
|
|