Project Description:
Replacement of a structurally deficient bridge on Cheshire Road over
Little Walnut Creek. This project is a design-build project, in which
the design and construction elements are combined into a single
contract. The design/build project format shortens the schedule of
the project and costs less than the traditional design-bid-build
process, however, the type of projects that can be performed using this
contracting method are limited.
Project Location and Limits:
Cheshire Road about 1/8 mile west of Golf Course Road, Berkshire
Township. Limits of work approximately 500 feet east and west of
the bridge.
Road Closure Information:
Cheshire Road closed to through traffic, with a posted detour.
Road closure estimated to be less than 3 months.
Project Schedule:
Right-of-way acquisition: None required
Utility relocation: May 2006
Construction: May to July 2006
Construction Information:
Contractor: R&I Construction of Tiffin, Ohio.
Engineer: Poggemeyer Design Group, Bowling Green, Ohio.
Total contract
amount $526,510.00.
Estimated Project Cost:
$550,000
|