PROJECT INFORMATION
Delaware County ARRA
Resurfacing (Various Roads)
Construction
Updates:
Phase 2 complete: The second phase
of the resurfacing project was completed May 29. This work included
microsurfacing of 8 miles of county and township roads.
The first phase of the Delaware
County ARRA funded resurfacing project was completed in October 2009, which
included asphalt
resurfacing of over 6 miles of township roads and city streets.
Project Description:
Pavement resurfacing and reconstruction on various city streets, county
and township roads. This project is funded through the
Mid-Ohio Regional
Planning Commission (MORPC) allocation of highway funding provided
by the 2009 American Recovery and Reinvestment Act (the federal stimulus
bill). This project is being sponsored by Delaware County, and is
a cooperative effort between MORPC,
Ohio Department of Transportation,
the cities of Delaware and
Powell,
Village of Sunbury, as well as
Orange,
Liberty and
Concord Townships.
Project Schedule:
Design engineering: May to June 2009
Right-of-way acquisition: None
Utility relocation: None
Construction: Oct. to Nov. 2009 (Phase 1); May 2010 (Phase 2)
Project Work Locations and Schedule:
|
Road Name |
From |
To |
Work Type & Schedule |
|
London Road (Delaware) |
U.S. 42 |
Advanced Auto Driveway |
Concrete pavement reconstruction (closure)
Opened
Nov. 5 |
|
Liberty Road (Delaware) |
Freedom Lane (Delaware) |
London Road (Delaware) |
Asphalt resurfacing (traffic maintained)
Completed Nov. 11 |
|
Cheshire Road (Delaware) |
U.S. 23 |
Braumiller Road |
Asphalt resurfacing (traffic maintained)
Completed Oct. 30 |
|
Liberty Street (Powell) |
CSX Railroad |
Olentangy St. (S.R. 750) |
Asphalt resurfacing (traffic maintained)
Completed Nov. 3 |
|
Cheshire Road (Sunbury) |
Sunbury village limit |
U.S. 36 |
Base reclamation & resurfacing (closure)
Opened Oct. 23 |
|
Africa Road (CR 21) |
Worthington Road |
Lewis Center Road |
Microsurfacing
(traffic maintained)
Completed May 26 |
|
Harriott Road (CR 131) |
Concord Road |
S.R. 745 |
Microsurfacing
(traffic maintained)
Completed May 28 |
|
Lewis Center Road (CR 106) |
Olentangy H.S. |
Woodstone Drive |
Microsurfacing
(traffic maintained)
Completed May 29 |
|
Concord Road (TR 129) |
Dublin city limit |
Cook Road |
Microsurfacing
(traffic maintained)
Completed May 28 |
|
Bale Kenyon Road (TR 107) |
Powell Road |
Lewis Center Road |
Asphalt resurfacing (traffic maintained)
Completed Nov. 5 |
|
Orange Road (TR 114) |
Perry Road |
U.S. 23 |
Asphalt resurfacing (traffic maintained)
Completed Nov. 7 |
Schedule current as
of May 29, 2010
Road Closure Information:
Closure to through traffic on the following roads:
- London Road
(Delaware) closed between U.S. 42 and the Advanced Auto driveway.
- Cheshire Road
(Sunbury) closed in the Sunbury village limits (about 1/2 mile west of
Cottontail Drive) with local traffic
maintained
On all other roads, one lane,
two-way operation of traffic will be maintained with flaggers in the
work zones. Brief
closures may also be required.
Engineering Information:
Construction documents prepared by the Delaware County Engineer’s
Design
Department.
Construction Information:
Contract awarded to Shelly Company ($1,795,005). 100% funded by
the 2009 American Recovery and Reinvestment Act.
Estimated Project Cost:
$1.85 million

Click to go to the Ohio
Recovery website
|