CHRIS E. BAUSERMAN, PE, PS DELAWARE COUNTY ENGINEER
Delaware County Engineer
50 Channing Street
Delaware, OH 43015
Bids are order by date, with most recent at top of the drop down box.
You may need to use the scroll feature of the drop down box.
Select Project: ---- Select Project ---- 2/16/2010 - DEL-TR29-2.22 Green Cook Road over Duncan Run 12/15/2009 - DEL-CR24-5.02 S. Old 3-C Bridge Design-Build Rehabilitation 12/14/2009 - 2010 Rolled Steel Shapes Contract 12/14/2009 - 2010 Rebar Contract 12/14/2009 - 2010 Concrete Contract 12/14/2009 - 2010 Plastic Pipe Contract 12/14/2009 - 2010 Stone Contract 12/14/2009 - 2010 Concrete Pipe Contract 12/14/2009 - 2010 Guardrail Installation Contract 10/13/2009 - DEL-TR29-3.00 Furnishing Precast Box Culvert 9/22/2009 - DEL-CR609-4.85 Sawmill Pkwy and Attucks Drive Traffic Signal 9/15/2009 - DEL-COUNTY ARRA RESURFACING 9/8/2009 - DEL-TR82-0.25 Giehl Road over Leatherwood Run 7/21/2009 - DEL-CR33-6.30 Carters Corner over Little Walnut Creek 6/10/2009 - Kelly-McMaster Road DEL-TR219-00.16 6/10/2009 - Liberty Road Widening at Havener Park 6/9/2009 - DEL-CR31-1.11 Red Bank Road over Hoover Reservoir 6/1/2009 - 2009 Brookview Ditch Improvement Project 4/21/2009 - 2009 Road Improvement Program 4/14/2009 - 2009 LAHMCM 4/1/2009 - Lewis Center & Old State Road Intersection Improvements 2/25/2009 - Center Village Bridges DEL-CR25-04.10 2/23/2009 - McNamara Ditch Improvements 12/30/2008 - 2009 Concrete Pipe Contract 12/29/2008 - 2009 Rebar Contract 12/29/2008 - 2009 Stone Contract 12/29/2008 - 2009 Plastic Pipe Contract 12/29/2008 - 2009 Rolled Steel Shapes Contract 12/29/2008 - 2009 Concrete Contract 12/23/2008 - Big Walnut and Old 3C Hwy Drainage Improvements Phase 1 12/21/2008 - 2009 Guardrail Installation Contract 12/2/2008 - Orange Road over Olentangy River Bridge DEL-TR114-0.00 Part 1 10/20/2008 - Sheets Ditch #318 Ditch Improvement 8/26/2008 - Sawmill Parkway Extension to Hyatts Road DEL-CR-609-4.84 7/29/2008 - Bunty Station Road Reconstruction (DEL-TR141-0.00) 7/1/2008 - Wilson Road over Little Walnut Creek Bridge Replacement 6/24/2008 - Patrick Road over Culver Creek Bridge Replacement 6/19/2008 - Lane Road over South Fork of Culver Creek Bridge Replacement 6/17/2008 - Stover Road over Duns Run Bridge Replacement 5/6/2008 - 2008 Road Improvement Program 3/24/2008 - 2008 Asphalt 3/17/2008 - 2008 Roadside Mowing Program 1/8/2008 - Sawmill & Presidential Pkwy. Traffic Signal Construction 1/7/2008 - Jones-Timms Ditch Improvement 12/27/2007 - 2008 Polyethelene Pipe Supply Contract 12/27/2007 - 2008 Stone Supply Contract 12/27/2007 - 2008 Precast Concrete Flat Top Culvert Contract 12/27/2007 - 2008 Precast Concrete Arch Culvert Contract 12/27/2007 - 2008 Reinforcing Steel Supply Contract 12/27/2007 - 2008 Ready Mix Concrete Contract 12/27/2007 - 2008 Concrete Pipe Supply Contract 12/27/2007 - Chapman Road Slide Repair Project 12/27/2007 - 2008 Precast Concrete Box Culvert Contract 12/27/2007 - 2008 Guardrail Installation Contract 10/9/2007 - North Old State Road over Leatherwood Run Bridge Replacement 9/25/2007 - Cheshire Road/Alum Creek Causeway Repairs 9/18/2007 - Home Road over North Branch Eversole Run Bridge Replacement 7/30/2007 - Basinger Ditch Improvements 7/12/2007 - Dustin Road Improvements Project 6/26/2007 - Larcomb Road over Duns Run Bridge Replacement 5/1/2007 - 2007 Road Improvement Program 4/17/2007 - DEL-750-5.53 - Green Meadows Drive Realignment 4/3/2007 - Ball Bank Curve Study 2007 1/1/2007 - 2007 Asphalt Materials 12/11/2006 - 2007 Guardrail Supply Contract 12/11/2006 - 2007 Guardrail Installation Contract 12/11/2006 - 2007 Precast Concrete Arch Culvert Contract 12/11/2006 - 2007 Precast Concrete 3-Sided Flat Topped Culvert Contract 12/11/2006 - 2007 Rebar Contract 12/11/2006 - 2007 Rolled Steel Shapes Contract 12/11/2006 - 2007 Steel Bridge and Piling Contract 12/11/2006 - 2007 Precast Concrete 4-Sided Box Culvert Contract 12/11/2006 - 2007 Concrete Contract 12/11/2006 - 2007 Stone Contract 12/11/2006 - 2007 Plastic Pipe Contract 12/11/2006 - 2007 Wood Bridge Flooring Contract 11/27/2006 - Coomer Ditch Improvement 11/27/2006 - Old Kingston Ditch Improvement 10/17/2006 - Sunbury Road and Yankee Street Intersection Improvements 9/19/2006 - SR 521-Primmer Ditch Culvert 9/11/2006 - Primmer Ditch Petition Project “Top End” Only 7/31/2006 - Gwinner Ditch Petition 7/31/2006 - Section Line Road – OSU Project Improvement 5/22/2006 - Rebid of Sacket #328 Ditch Petition 3/15/2006 - Thomas Road Bridge Replacement Project 3/6/2006 - Rebid of PRIMMER DITCH PETITION PROJECT 3/6/2006 - Rebid of SMITH #198 DITCH PETITION PROJECT 3/3/2006 - 2006 - 2007 Road Side Mowing 2/20/2006 - Rebid of Concord Rd Drainage Improvements 2/1/2006 - SMITH 198 DITCH PETITION PROJECT 1/31/2006 - Cheshire Road Bridge over Little Walnut Creek 12/28/2005 - Concord Road Drainage Improvements Project 12/14/2005 - 2006 Flat Top Culvert 12/14/2005 - 2006 Guardrail 12/14/2005 - 2006 Box Culvert 12/14/2005 - 2006 Steel Bridge 12/14/2005 - 2006 Seeding 12/14/2005 - 2006 Bridge Flooring 12/14/2005 - 2006 Reinforced Concrete Pipe 12/14/2005 - 2006 Reinforcing Steel 12/14/2005 - 2006 Rolled Steel Shapes 12/14/2005 - 2006 Concrete 12/14/2005 - 2006 Road Improvement Program 12/14/2005 - 2006 Stone and Cold Mix 12/14/2005 - 2006 Hauling 12/14/2005 - 2006 Two Men and a Paver 12/14/2005 - 2006 Poly Tubing 12/14/2005 - 2006 Arch Top Culvert 10/24/2005 - SUNBURY ROAD OVER HOOVER RESERVOIR BRIDGE PROJECT 9/12/2005 - U.S. Route 23 -- Olentangy Crossings Intersection Signal 9/7/2005 - Olentangy Crossings TIF 8/2/2005 - Sawmill Parkway Extension Project 7/20/2005 - Orange Road Improvements ITB.pdf 7/12/2005 - Olentangy Crossings Assess 7/1/2005 - Fry & Morey Road Improvements 6/8/2005 - Dent Road Bridge Replacements Project 4/22/2005 - Tussic Street Widening 4/6/2005 - Sawmill Parkway Brewster Lane Intersection Signal 2/9/2005 - Stockwell Road Bridge Replacement Project 1/5/2005 - Hoskins Road Bridge 12/15/2004 - 2005 Hauling 12/15/2004 - 2005 Crushed Limestone Material / SS921 Cold Mi 12/15/2004 - 2005 Various Rolled Steel Shapes 12/15/2004 - 2005 Various Sizes, Reinforcing Steel for Concrete Reinforcement 12/15/2004 - 2005 Reinforced Concrete Pipe Rebid 12/15/2004 - 2005 Corrugated Polyethylene Tubing & Pipe Materials 12/15/2004 - 2005 Corrugated Metal Pipe Material 12/15/2004 - 2005 Ready Mix Concrete 12/15/2004 - 2005 Sizes of Treated Wood for Bridge Flooring 12/15/2004 - 2005 LIQUID ASPHALT, HOT MIX AND TWO MEN AND A PAVER 12/15/2004 - 2005 Various Sizes of 3-Sided Flat Topped Precast Concrete Culverts 12/15/2004 - 2005 Various Sizes of 4-Sided Precast Concrete Box Culverts 12/15/2004 - 2005 Various Sizes of 3-Sided Arch Topped Precast Concrete Culverts 12/15/2004 - 2005 Ready Mix Concrete 12/15/2004 - 2005 General Paving Program 12/15/2004 - 2005 Guardrail Items 12/15/2004 - 2005 Seeding and Mulching 12/15/2004 - 2005 Steel Beam Bridge Components (Design/Build) 12/15/2004 - 2005 Reinforced Concrete Pipe Materials 10/23/2004 - Cook Road Bridge Replacement Project 6/23/2004 - Creek Road Bridge Replacement Project 6/23/2004 - Horseshoe Road Bridges Project 3/10/2004 - Hills Miller Road Widening Project 2/4/2004 - Roberts Road Realignment Project 9/8/2003 - Liberty North Bridges 6/9/2003 - Sawmill Parkway Big Bear Signal Project 4/21/2003 - Kingston Township Culvert Replacement