Delaware County Engineer

50 Channing Street

Delaware, Ohio 43015

Bidding & Contracts

Contact Us

Current Projects

Delaware County Map

Departments

Design Resource Page

Engineer's History

Links of Interest

News Archive

Permit Information

Road Closures

Street List Database

Standards Manual

Township Engineering

Contact the Webmaster

Administration     |     Design     |     Development     |     Inspection    |    Map     |    Operations       Permits        Stormwater

  Permits Department 

PERMITS DEPARTMENT


 

We accept cash, check or credit cards for payment of permit fees.  Online credit card payments are processed through Point & Pay.  Please note that the service provider charges a convenience fee.

 

Payment is for Delaware County Engineer's Office Only. For Building Department Permits click here.

 

About Us

The permit and utility coordination staff oversees work within the right-of-way by public utilities and property owners.  This ensures that all utility work, including relocation of overhead and buried electric, phone, cable, water and gas lines does not interfere with the safety and operation of the county road.  Also, any work done by a resident to the front of their property (inside the road right-of-way), including construction of new driveways, installation of drainage pipes, re-grading ditches or installing obstructions that would otherwise affect the operation or safety of the road must be reviewed by the permit department.

 

Hauling permits for vehicles over Ohio Legal Load

Chapter 5577 of the Ohio Revised Code governs the size and weight limits for all vehicles on public streets and highways.  When it becomes necessary for these limits to be exceeded by a vehicle or conveyance, it must be done in accordance with established policies and procedures of the appropriate agency which maintains the particular road(s).  Click here for more information on hauling permits for oversized or overweight vehicle permits.

 

Right-of-way permits

The authority to regulate work that obstructs or interferes with the safety or usage of any portion of the county right-of-way is provided in Chapter 5547 of the Ohio Revised Code and includes all objects in the right-of-way that are owned by utilities or adjacent property owners.  The authority to regulate the installation of driveway culverts, other excavation or construction/reconstruction of utility poles on township roads is provided in Section 5571.16 of the Ohio Revised Code Click here for more information on right-of-way work permits.

 

Stormwater permits

The stormwater administration staff is responsible for administration of the Phase II National Pollution Discharge Elimination System (NPDES) Storm Water Program.  The staff inspects the drainage and erosion control on construction projects in Delaware County to ensure that surface waters are not contaminated by sediment and runoff from construction sites. Click here to visit the Stormwater department home page for more information

 

 

You may apply for any of the above permits at the following email address: dceopermits@co.delaware.oh.us. Please submit the permit application with accompanying forms and proof of payment for approval.

 


Review Delaware County's Privacy Policy Click Here